Examples created for SIMA 5.2

Case Description Tags

The Grid21 shared mooring farm consists of 2 INO WINDMOOR 12MW reference floating wind turbines (FWTs) at a water depth of 350 m. Each FWT is connected to three anchor lines and a shared line.

A model summary can be found in the storage s-task ST_doc, and can also be accessed from here: Grid21 shared mooring farm model summary

wind INO 12MW wind farm mooring

static grid2by1

The Grid33 shared mooring farm consists of 2 INO WINDMOOR 12MW reference floating wind turbines (FWTs) at a water depth of 350 m. Each FWT is connected to four lines, with the column supporting the tower containing two fairleads.

A model summary can be found in the storage s-task ST_doc, and can also be accessed from here: Grid33 shared mooring farm model summary

wind INO 12MW wind farm mooring

static grid3by3